Part time 16 months fixed term
(0.3 FTE) Flexible 12 hours per week
An exciting opportunity exists with this newly created project role to focus on the preconstruction phase of a community-owned solar farm of 1.45 to 1.6MW in the Natimuk Area.
The role will provide the community with a facility capable of producing the equivalent amount of electricity that Natimuk uses, incorporate options to enable the community to own this asset, and to reap the benefits of locally produced electricity. Will demonstrate how a small rural community can own and operate a facility of this kind; and create a model for other small rural communities to use themselves.
The closing date for this position is 6 March 2020, 5pm with interviews to be held on or around 9 – 13 March 2020.
For further information contact Sue Newall, on 0407 611 299. Position descriptions can be downloaded here or at or natimukcommunityenergy.org
To apply for this position email sue.newall@centreforparticipation.org.au with Natimuk- Community Energy Solar Farm – Project Coordinator in the subject field; forward your application letter addressing the key selection criteria (maximum two pages) and resume.